Infinera’s Fallon: 40G opportunity limited while carriers wait for 100G - Lightwave

Infinera’s Fallon: 40G opportunity limited while carriers wait for 100G

Besides discussing his company’s fiscal second quarter performance in a call with analysts late July 19 (see "Infinera 2Q revenues at upper end of guidance; 3Q guidance positive"), Infinera (NASDAQ:INFN) President and CEO Tom Fallon offered a few observations on the relative market demand for 40-Gbps and 100-Gbps systems.

Fallon told those on the call that he supported the view of those analysts who have predicted “an optical ramp” that would start next year and continue through 2013 with the deployment of coherent-enabled 100-Gbps technology. (For an example of such an analyst viewpoint, see “Infonetics: Optical reboot sees swift shift to 100G.”) Conversely, 40-Gbps will see deployment as a “tactical bridge” between current fiber exhaust at 10 Gbps and the time when 100-Gbps technology becomes economically attractive in 2013.

However, that doesn’t mean there isn’t money to be made in selling 40-Gbps technology -- or, in the case of Infinera, not losing it. There is significant demand for 40-Gbps capabilities now, Fallon says – and, since Infinera is only now bringing a 40-Gbps line card to market, the company has had to cut prices on its 10-Gbps offerings to forestall potential customers who want to move to a higher data rate from going somewhere else, both Fallon and CFO Ita Brennan said on the call. Fallon also added that analysts tell him that 50% of the 40-Gbps market resides in requirements for non-coherent 40-Gbps  systems in China, where the move to 100 Gbps is expected to be slower than in the West. The result is a potential market size of well over $1 billion over the next few years, Fallon said later in the call. He expects Infinera to prosper from 40-Gbps deployments for submarine network applications in particular, he added.

That said, Fallon believes that the majority of carriers want to move to 100-Gbps systems as quickly as feasible. Once the 100-Gbps wave hits, it will wash away at least some demand for 40-Gbps technology, he said. Fallon expects Infinera to be ready to ride that wave, as he predicted carrier lab trials of Infinera’s 100-Gbps systems (which will leverage a new 500 Gbps photonic integrated circuit) will begin at the start of next year. He expects to be able to ship such systems in volume during the first half of 2012.

For more information on high-speed transmission systems and suppliers, visit the Lightwave Buyers Guide.
 

Post a Comment

Easily post a comment below using your Linkedin, Twitter, Google or Facebook account.

Featured Slideshow

Related Companies

Dynamic Systems Inc

Provides barcode tracking for tools and equipment, inventory, ID badge systems, job costing time and attendance, document tracking, capital assets, wireless...

Fiberguide Industries Inc

Fiber Optic Solutions company to OEM market with multimode (including Hard Clad), singlemode and graded-index fibers from UV (180nm) to NIR (2.7 microns), an...

ISOMET (UK) Ltd

Manufacturer of acousto-optics, RF driver and sub-systems. Applications include modulation, scanning and frequency shifting, spanning the near-UV to far-IR. ...

Related Products

Anritsu Optical Spectrum Analyzer (OSA) MS9740A

The MS9740A is a benchtop optical spectrum analyzer covering 600 nm to 1750 nm. The MS9740A offers high-per...

FiberQA's mini-AVIT Inspection System

The mini-AVIT inspects all of the fibers without removing them from the polishing plate, reducing significa...

JGR MS12001 Cable Assembly Test System

The MS12001 system provides the most accurate mandrel-free IL and RL measurement in the industry for both c...

Most Viewed

Webcasts

Trends in Silicon Photonics

( 11/12/2014 / 01:00 PM Eastern Daylight Time / 12:00 PM Central Daylight Time / 10:00 AM Pacific Daylight Time / 18:00 GMT )
Sponsored by

Active Optic Cable Test Solutions: Testing AOC/DAC QSFP+ cables up to 100Gb/s

( 11/06/2014 / 01:00 PM Eastern Daylight Time / 12:00 PM Central Daylight Time / 10:00 AM Pacific Daylight Time / 18:00 GMT )
Sponsored by

Verifying PAM4 Performance in 28G & 56G Designs

( 11/04/2014 / 01:00 PM Eastern Daylight Time / 12:00 PM Central Daylight Time / 10:00 AM Pacific Daylight Time / 18:00 GMT )
Sponsored by

Social Activity