Datwyler completes FTTH pilot for Zurich electricity company

Nov. 29, 2011
Datwyler Cables says it has successfully completed an FTTH pilot project for Zurich electricity company ewz. Starting in October 2010, Datwyler connected 106 buildings with 1400 residential units in the Hardstrasse area of Zurich, Switzerland.

Datwyler Cables says it has successfully completed an FTTH pilot project for Zurich electricity company ewz. Starting in October 2010, Datwyler connected 106 buildings with 1400 residential units in the Hardstrasse area of Zurich, Switzerland.

In its capacity as a turnkey project supplier Datwyler carried out on-site analysis, drew up the design proposal, delivered the requisite system, and – in collaboration with certified partners on the ground – carried out the installation, documentation, and maintenance of the new infrastructure.

So what was constructed? The first thing when connecting fiber optics to all 106 buildings was to sink nine telecom shafts and route approximately 38 km of subducts through the existing pipe system, the company explains. These interconnect the shafts with the main optical distribution board at the point of presence (PoP). The installation companies used microtubes between the shafts and the individual optical premises.

The contract also involved blowing fiber-optic cables into the pipes and all the requisite splicing and connecting work. The PoP and the telecom shafts are interconnected by over 8 km of feeder cable. Around 20 km of Datwyler’s newly developed S-Micro cable were used for the drop connections from the shafts to the buildings.

At the same time, as part of the excavation work and in parallel to the FTTH build, main terminals and main electrical connection boxes were replaced in buildings with old electrical systems.

As the lead contractor, Datwyler delivered the project in close cooperation with local civil engineers, telecom assembly companies, installation and splicing contractors. “Construction work was completed in March 2011 thanks to Datwyler’s expert planning and extensive project experience, and the turnkey project was handed over to ewz on time,” the company said.

For more information on FTTx/access systems and suppliers, visit the Lightwave Buyer’s Guide.

Sponsored Recommendations

Coherent Routing and Optical Transport – Getting Under the Covers

April 11, 2024
Join us as we delve into the symbiotic relationship between IPoDWDM and cutting-edge optical transport innovations, revolutionizing the landscape of data transmission.

Scaling Moore’s Law and The Role of Integrated Photonics

April 8, 2024
Intel presents its perspective on how photonic integration can enable similar performance scaling as Moore’s Law for package I/O with higher data throughput and lower energy consumption...

Supporting 5G with Fiber

April 12, 2023
Network operators continue their 5G coverage expansion – which means they also continue to roll out fiber to support such initiatives. The articles in this Lightwave On ...

Constructing Fiber Networks: The Value of Solutions

March 20, 2024
In designing and provisioning a fiber network, it’s important to think of it as more than a collection of parts. In this webinar, AFL’s Josh Simer will show how a solution mindset...