Termination stub

Feb. 1, 1995

Termination stub

The Optifit assembly addresses hybrid fiber/coaxial-cable networks. The stub connects the optical network unit to the optical drop cable at the receiver node. Available in lengths to 40,000 feet, the assembly includes a furcation unit that supports two to 12 optical fibers in protective subunits and a metal fitting that links the furcation unit to the hardware. An epoxy-filled aluminum sleeve strain-relieves fibers and protects against water penetration.

Siecor Corp.

Sponsored Recommendations

Fiber Optic Connectivity

Aug. 16, 2024
Date: September 10, 2024Time: 1:00 PM EDT / 12:00 PM CDT / 10:00 AM PDT / 5:00 PM GMT Sponsor: Sumitomo & Tempo CommunicationsDuration: 1 Hour Register Today...

New Optical Wavelength Service Trends

July 1, 2024
Discover how optical wavelength services are reshaping the telecom landscape, driven by rapid expansion and adoption of high-speed connections exceeding 100 Gbps, championed by...

ON TOPIC: Cable’s Fiber to the X Play

Aug. 28, 2024
Cable operators are strategically deploying fiber-to-the-home (FTTH) networks in Greenfield markets and Brownfield markets where existing cable plant has reached its end of life...

Reducing Optical Network Costs

Aug. 27, 2024
With the growing demand for optical fiber networks to support AI, quantum computing, and cloud technologies, expanding existing networks to handle increased capacity presents ...