Ciena: WaveLogic 5 Nano 100G – 400G Universal QSFP-DD

Feb. 7, 2023
Ciena says its WaveLogic 5 Nano 100G-400G Universal QSFP-DD represents the highest reach-capacity in the smallest pluggable transceiver area and power envelope based on the highest baud coupled with a +4-dBm optical output power.
Ciena says its WaveLogic 5 Nano 100G-400G Universal QSFP-DD represents the highest reach-capacity in the smallest pluggable transceiver area and power envelope based on the highest baud coupled with a +4-dBm optical output power, all integrated within a QSFP-DD package. The module is the smallest footprint 400G high-performance coherent modem available with the greatest flexibility for support across a range of network architectures and photonic line systems courtesy of the embedded EDFA and TOF, the company adds. Another differentiator is the support for diverse operator deployment requirements.

Judge’s Comment: “Ciena has always been a leader in coherent DSP development so it is great to see them leverage this capability in new products that are not limited to use in only their products. This product will support a wide range of use cases and provide flexibility to end-users.”

Sponsored Recommendations

Fiber Optic Connectivity

Aug. 16, 2024
Date: September 10, 2024Time: 1:00 PM EDT / 12:00 PM CDT / 10:00 AM PDT / 5:00 PM GMT Sponsor: Sumitomo & Tempo CommunicationsDuration: 1 Hour Register Today...

New Engineering Essentials for High-Speed Digital Design

Aug. 22, 2024
Pushing the boundaries of high-speed digital performance demands innovative development methods. This guide outlines everything you need to tackle complex designs, high-speed ...

Your Guide to Data Center Testing Success

Aug. 22, 2024
Each new generation of high-speed computing standards promises faster data rates and new engineering challenges. This guide offers a glimpse into the latest design and test automation...

ON TOPIC: Cable’s Fiber to the X Play

Aug. 28, 2024
Cable operators are strategically deploying fiber-to-the-home (FTTH) networks in Greenfield markets and Brownfield markets where existing cable plant has reached its end of life...