Yelo Ltd. now offers an automated high-volume test and burn-in system designed to aid the manufacture of optical components for 100-Gbps data center networks.

Yelo Ltd. now offers an automated high-volume test and burn-in system designed to aid the manufacture of optical components for 100-Gbps data center networks.

The UK-based automated test and measurement company will tout the system at the upcoming China International Optoelectronic Exposition (CIOE), September 6-9 in Shenzhen, in booth 6005. David Simms, Yelo's director of sales and marketing, expects significant interest in the system.

"Our market research has identified that the use of optical components in data centers will grow by a factor of 100 over the next 8 years," says Simms. "This means that optical component manufacturers need to scale production from 10,000 components per month to 500,000 or even 1 million per month.

"It is simply not possible to scale this volume with people so they need automated assembly, automated test, automated burn-in, and automated packaging," he concludes.

The new system leverages the company's experience in burn-in and test to enable component manufacturers to increase volume, with improved yield and at lower labour cost, Simms asserts.

For related articles, visit the Test & Measurement Topic Center.

For more information on test systems and suppliers, visit the Lightwave Buyer's Guide.

Sponsored Recommendations

Meeting AI and Hyperscale Bandwidth Demands: The Role of 800G Coherent Transceivers

Nov. 25, 2024
Join us as we explore the technological advancements, features, and applications of 800G coherent modules, which will enable network growth and deployment in the future. During...

Getting ready for 800G-1.6T DWDM optical transport

Dec. 16, 2024
Join as Koby Reshef, CEO of Packetlight Networks addresses challenges with three key technological advancements set to shape the industry in 2025.

The Road to 800G/1.6T in the Data Center

Oct. 31, 2024
Join us as we discuss the opportunities, challenges, and technologies enabling the realization and rapid adoption of cost-effective 800G and 1.6T+ optical connectivity solutions...

On Topic: Tech Forecast for 2025/ What Will Be Hot

Dec. 9, 2024
As we wind down 2024, Lightwave’s latest on-topic eBook will examine the hot topics for 2025. AI is at the top of the minds of optical industry players supporting...