Over the last several decades, cable management, routing cross connects, backbone, or trunk cables through a DC facility, has gradually migrated from utilizing the space under raised flooring to creating new pathways via overhead suspended trays. Spurred on by massive increases in hardware and cables needed to provide the bandwidth to store and process the data within modern hyperscale data centers, these once convenient underfloor pathways became a liability as constriction steadily decreased subfloor air flow and increased overall ambient temperature. However, whereas raised floor pathways offered a large area to place cables and flexibility in the form of the number and weight of the cables placed, overhead trays are limited. They must abide by tray capacity standards, meaning that the cable diameter and weight for the fiber count is now of the utmost importance.

What do the Standards Say?

 

National Electrical Code (NFPA 70) Article 392 – Cable Tray Standard states: “the sum of the area of all cables at any cross section shall not exceed 50 percent of the interior cross-sectional area of the cable tray.”

The Telecommunications Industry Association (TIA- 942) Telecommunications Infrastructure Standard for Data Centers limits cable tray capacity to 40 percent.

Tray Densities by Fiber Count

Considering the above standards and the trend towards ever-increasing bandwidth needs in the DC, trunk or cross-connect cables reaching from 288 – 1728-F within the DC with small counts used to connect specific areas are not uncommon. Assuming that weight limits are met throughout the examples, the numbers below offer insight into the densities possible within a single overhead tray.

For all examples above we have solved for a 4-inch-deep, 24-inch-wide tray offering 96 square inches of cable pathway with a 50-percent fill rate as its maximum. Additionally, we will assume the use of Sumitomo Electric Lightwave’s (SEL) Freeform Ribbon™ Indoor Central Tube 250 μm cables.

Using these results as a guide, DC managers can now focus on network flexibility, future readiness, lifetime ease of use, security, and overall cost (installation and product cost) when finalizing infrastructure designs.

For more information on products and network design questions, contact a Sumitomo Electric Lightwave expert.

Learn More

Sponsored Recommendations

ON TOPIC: Cable’s Fiber to the X Play

Aug. 28, 2024
Cable operators are strategically deploying fiber-to-the-home (FTTH) networks in Greenfield markets and Brownfield markets where existing cable plant has reached its end of life...

Fiber Optic Connectivity

Aug. 16, 2024
Date: September 10, 2024Time: 1:00 PM EDT / 12:00 PM CDT / 10:00 AM PDT / 5:00 PM GMT Sponsor: Sumitomo & Tempo CommunicationsDuration: 1 Hour Register Today...

Reducing Optical Network Costs

Aug. 27, 2024
With the growing demand for optical fiber networks to support AI, quantum computing, and cloud technologies, expanding existing networks to handle increased capacity presents ...

PON Evolution: Going from 10G to 25, 50G and Above

July 23, 2024
Discover the future of connectivity with our webinar on multi-gigabit services, where industry experts reveal strategies to enhance network capacity and deliver lightning-fast...